609Course · Practitioner

Iterative Improvement

The loop after launch.

The Course

The loop after launch. Prompt iteration in production, data flywheels honestly, and A/B testing done with statistical care.

Outcomes
  • 01

    Design the improvement loop.

  • 02

    Prioritize changes.

  • 03

    Measure lift.

  • 04

    Avoid local maxima.

Prerequisites
  • Metrics for AI Products.
Pacing

~3 hours.

A Note from the Faculty

Iteration is a discipline, not an instinct.